Because the building in the first time when the Geberit products were installed, the interior was mostly cement, So the main concept is thus produced: "wall" is a good friend of Geberit. We use the same floor drainage system designed in front of the wall and behind the wall to give customers a better understanding of the pipes in the wall and the products outside the wall. Hidden invisible technology is very important.